• Project: WTP for water desalinization Client: AL ALFAIR GROUP, Kuwait
    Date: 07.11.2011

    Full automatic system for water desalinization from brackish borehole water with UF and RO unit. Project, manufacturing and system start-up.

    Total net capacity 1000 l/h

  • Project: Reconstruction of water system network, pump station "Rudovci" Client: Public communal enterprise Lazarevac, Serbia
    Date: 07.11.2011

    Delivery, montage and start-up.
    Capacity 3 x 5 l/s @ 64 m
    Pump motor power 3 x 5,5 kW

  • Project: Reconstruction of water system network, water hammer vessels in "Medosevac" Client: Public communal enterprise Lazarevac, Serbia
    Date: 07.11.2011

    Delivery, montage and start-up of water hammer vessels, each vessel with 3000 l volume.

  • Project: Reconstruction of water system network, pump station "Ceroviti potok" Client: Public communal enterprise Lazarevac, Serbia
    Date: 07.11.2011

    Delivery, montage and start-up.
    Capacity 76 m3/h @ 67 m
    Pump motor power 21,6 kW

  • Project: Drinking water WTP Client: Public communal enterprise "Milos Mitrovic" in Velika Plana, Serbia
    Date: 07.11.2011

    Drinking water WTP for iron and manganese removal. Turn-key service (project, delivery, montage and start-up)
    Total net capacity 40 l/s.

  • Project: Reconstruction of pump station "KLADNICA" Client: Public Enterprise ”Electric power industry of Serbia
    Date: 07.11.2011

    Replacement of four butterfly valves DN 500 PN 10 on pump discharge side and implementation of new electro-pneumatic operation and control system.

  • Project: Pilot Project Kalenic Client: Public Enterprise ”Electric power industry of Serbia”
    Date: 07.11.2011

    The aim of this pilot project is to establish new necessary water treatment which will be applied on near by filter plant with capacity of 100 l/s.
    Capacity of pilot system is 1000 l/h

  • Project: RO system Client: Agroziv a.d., Serbia
    Date: 07.11.2011

    WTP with pretreatment, RO unit and UV sterilization. Pretreatment includes AC filter, duplex softener, NaOH dosing unit and microfiltration.
    Total net capacity 1500 l/h.

  • Project: Reconstruction of a mobile facility for water treatment built in 1984 Client: EPS, RJ Kolubara excavation site
    Date: 17.07.2009

    A complete reconstruction of the mobile facility for iron removal. Reconstruction, technical improvements and putting into operation. Total capacity 10 l/s.

  • Project: Dosing station Client: ProMinent, France
    Date: 17.07.2009

    Automated system for dosing of hypo-chlorate and sodium-hydroxide made of stainless steel. Production, installation and putting into operation (mounting construction, containers, pipelines, valves, sensors, primers, automated-steering system).

  • Project: Revitalization of chemical preparation water facility Client: Aluminium plant, Podgorica
    Date: 17.07.2009

    Production, installation and putting into operation of the new cation column in the line of water de-mineralization, facility for chemical preparation water. Total capacity of 35 m3/h.

  • Project: Revitalization of chemical preparation water facility 2 Client: Aluminium plant, Podgorica
    Date: 17.07.2009

    Production, installation and putting into operation of the filter station for chemical preparation water capacity of 45m3/h (3 x 15 m3/h).

  • Project: Neutralization of waste waters Client: HYDRO Aluminum, Germany
    Date: 17.07.2009

    Completely automated line for waste water neutralization (pH value correction). Production, installation and putting into operation. Total capacity of 20 m3/h.

  • Project: Mobile water treatment facility PRO-55 Client: EPS, RJ Kolubara excavation site
    Date: 17.07.2009

    Well water treatment facility with pre-treatment. Dimensions of one standard ISO 12 m container and one ISO 6 m container. The facility is designed  for the removal of ammonium, iron, manganese and suspended materials. Production, installation and putting into operation. Total capacity of 55 m3/h.

  • Project: Water treatment facility PRO 125A Client: ProMinent, France
    Date: 17.07.2009

    Water treatment facility, completely automated, dimensions of a standard ISO 12 m container. The facility is designed  for the treatment of well water, removal of iron, manganese and suspended materials. Production, installation and putting into operation. Total capacity of the facility 125 m3/h.

  • Project: Water treatment facility PRO 80A Client: ProMinent, France
    Date: 17.07.2009

    Water treatment facility, completely automated, dimensions of a standard ISO 12 m container. The facility is projected for the treatment of well water, removal of iron, manganese and suspended materials. Production, installation and putting into operation. Total capacity of the facility 80 m3/h.

  • Project: Filter station for a brewery Client: Apatin Brewery
    Date: 17.07.2009
    Partner: CHRIWA, Germany

    Production, delivery and installation (steel pipes, fittings, sand filters, etc).

  • Project: Reaction container for de-carbonization of water Client: Coca-Cola, IBP Belgrade
    Date: 17.07.2009
    Partner: CHRIWA, Germany

    Production, delivery, and installation of reaction container for water de-carbonization. Total capacity 100 m3

  • Project: GHAZOUET Client: the Republic of Algeria, National Agency for Drinking Water (A.G.E.P)
    Date: 17.07.2009
    Partner: Linde KCA (Linde AG, Germany)

    Pre-treatment station for 8 units for desalinization. Capacity 22,250 m3/day.
    Production, delivery and installation at the location of machine equipment (steel pipes, fittings, sand filters, etc).

  • Project: SKIKDA Client: the Republic of Algeria, National Agency for Drinking Water (A.G.E.P)
    Date: 17.07.2009
    Partner: Linde KCA (Linde AG, Germany)

    Pre-treatment station for desalinization facility. Capacity 2,500 m3/day.
    Production, delivery and installation at the location of machine equipment (steel pipes, fittings, sand filters, etc).

  • Project: MAZAFRAN Client: the Republic of Algeria, National Agency for Drinking Water (A.G.E.P)
    Date: 17.07.2009
    Partner: Linde KCA (Linde AG, Germany)

    Water treatment plant. Total capacity 50,000 m3/day
    Production, delivery and installation at the location of machine equipment (steel pipes, fittings, sand filters, lamella sedimentary units, etc).